From Experience to Data: CRCHI's World-First Full-Computerized Tunnel Support E
November 19,2026
Recently, two world-first pieces of fully computerized equipment independently developed by CRCHI — a drilling-anchoring-grouting integrated machine and an arch erection trolley — were successfully applied in a tunnel project. Equipped with high-precision onboard automatic positioning, computer layout, intelligent operation and full-process data recording, the machines bring key tunnel support processes such as bolt drilling-grouting and arch installation into a closed digital control loop, shifting tunnel support from traditional experience-based work to data-driven, self-controlled construction and providing strong equipment backing for mechanized, intelligent tunnel construction.
Full-Computerized Drilling-Anchoring-Grouting Machine: One-Button Bolt Support
Built specifically for tunnel bolt support, the machine's core strength lies in the deep integration of intelligent operation and digital information. It can receive bolt design drawings online and use onboard automatic positioning and computer hole-layout functions to generate work points automatically, completing a full sequence — drilling, bolt insertion, tensioning, locking and grouting — continuously and automatically at the press of a button. At the same time, the machine captures all critical bolt construction data, generating and uploading records in real time so workmanship can be reviewed and support quality quantified. This 'automated continuous work plus digital quality control' approach provides solid support for standardized, intelligent tunnel bolting.
Integrated construction by the fully computerized drilling-anchoring-grouting machine
Full-Computerized Arch Erection Trolley: Precise, Visible Arch Installation
Focusing on the tunnel arch installation process, the trolley uses digital tools to guide precise arch placement and control quality in real time. It receives arch design parameters online and, using onboard automatic positioning and computer layout, generates installation chainage automatically for visualized, precise guidance. During operation, the machine monitors key quality indicators — installation chainage, verticality, spacing and over/under-excavation — generating and uploading data in real time for dynamic visibility and a full data trail of arch installation quality.
Fully computerized arch erection trolley at work
The field deployment of the fully computerized drilling-anchoring-grouting machine and arch erection trolley fills a digital gap in tunnel support equipment and connects the full data chain for primary support quality. Next, CRCHI will keep advancing its tunnel intelligent equipment technology, expanding its smart equipment portfolio and helping railway tunnel construction accelerate toward smarter, greener and more industrial methods.
Source : www.51cm.org
Views : 5157
